Apply Online – Assam Power Supply Approval for Multi-Storied Building

Power Supply Approval for Multi-Storied Building APSC ORG

Apply Now Online for Power Supply Approval for Multi-Storied Building in Assam

The Government of Assam has introduced an online facility for applying for power supply approval for multi-storied buildings. This service aims to simplify the application process, reduce paperwork, and increase transparency.

Benefits of applying Online

  1. Convenience and time-saving
  2. Reduced paperwork and bureaucracy
  3. Real-time status updates
  4. Transparency and accountability
  5. Ensured compliance with regulations

Eligibility Criteria

  1. Ownership or occupancy of a multi-storied building in Assam
  2. Completed construction of the building
  3. Required documents

Required Documents for Power Supply Approval for Multi-Storied Building in Assam

  1. Electrical lay out drawings that show the appropriate rating / type / size(s) of all electrical Generators, equipments, accessories, etc. in the single line diagram and dimensions / clearances etc. in the physical layout plan & in the details of earthing layout plan including panels, Lightening arrestor
  2. A details load schedule of the connected load and test report of the internal electrical installation including earth system with due seal and signature of contractor /authorized person(s) and countersigned by the consumer / owner / occupier or its agent
  3. A copy of permission / NOC for construction of the building along with approved drawing from Municipal / Development / Appropriate local Authority
  4. Certified copy of approved drawing and NOC to construct the building and completion certificate to be enclosed.
  5. Connected load with break up of lighting, powers and others type of load in annexed sheet.
  6. Distribution System details:(A single line diagram clearly indicating all devices, controls, connection, with all ratings and specification to be furnished. Load in each sub-circuit to be shown. In case of individual flats/ units having similar connections and electrical loads, details of one unit of each type only need to be furnished).
  7. Physical layout plan indicating the position of the transformer, panels, generator, route of all OH line/cables with dimensions/clearances.
  8. Position of Main Control Room/Breakers/MCCBs/MCB, DB & electrical cable ducts and layout of main cable(s).
  9. A single line diagram of the main panel(s) indicating all connections and control/protective and metering equipment/devices with ratings and specifications.
  10. A front view of the panel(s) indicating all equipment/devices.
  11. A Test Report of the panel duly signed by the Electrical Supervisor of the manufacturer who has manufactured the electrical panel(s).
  12. Details of earthing (A layout of earthing of the main panel and other equipment to be furnished in the diagram required under 7.4 above.)
  13. Has lightning protection been provided:?Detailed diagram of lightening protection to be provided separately.
  14. Furnish details of fire protection/fire alarm system provided. NOC of state fire department to be furnished.
  15. Testing. A detailed test report with 

Online Application Process

  1. Visit the Sewa Setu Assam website (Click Here)
  2. Click on “Public Services” and select “Power Supply Approval for Multi-Storied Building”
  3. Register and login with your credentials (Aadhaar number)
  4. Fill out the online application form for power supply approval
  5. Upload required documents
  6. Pay the applicable fee online
  7. Submit and print the acknowledgment

Stipulated Time Limit

  • 15 (Fifteen) working days from the date of submission of application, completed in all respects along with documents as per checklist.

Fees

  1. Service charge (through PFC/CSC) – Rs. 30
  2. Printing charge (in case of any printing from PFC/CSC) – Rs. 10 per page
  3. Scanning charge (in case documents are scanned in PFC/CSC) – Rs. 5 per page.
  4. Application Fee- N/A

Important Guidelines

  1. Ensure accuracy and completeness of application form and documents
  2. Pay applicable fees online
  3. Maintain records of application and supporting documents
  4. Comply with Government of Assam regulations

Additional Tips and Contact Information

  1. Verify documents carefully before submission
  2. Keep a copy of your application and supporting documents
  3. Ensure timely application to avoid delays
  4. Consult professionals for complex applications
  5. Sewa Setu Assam website: (Click Here)

Conclusion

Apply for power supply approval for your multi-storied building in Assam with ease! With the online application process, you can save time and effort. Follow these simple steps and secure your approval today


Frequently Asked Questions (FAQs)

What is the purpose of power supply approval for multi-storied buildings?

To ensure safe and legal electrical connections.

Who can apply for power supply approval for multi-storied buildings?

Owners or occupants of multi-storied buildings in Assam.

How to Apply for power supply approval for multi-storied buildings?

You can apply online through sewa setu